The 82km Phase 1 of the RRTS, being built at a cost of ₹30,274 crore, will connect Delhi, Ghaziabad and Meerut and is slotted for commissioning in March 2025. A 17km stretch of the route in Ghaziabad is getting developed as a priority section and it will be the country’s first RRTS stretch to open in March 2023 Read More